Fixture counts to code
Restrooms sized for occupancy.

Building Systems
Restrooms, sinks, floor drains and grease lines are some of the most expensive and most regulated parts of a build-out.
Call or text today615-431-3789Commercial Plumbing & Restrooms
Plumbing decisions made early can save a project. Fixture counts are set by occupancy, accessible restrooms have exact clearances, floor drains and grease interceptors need slope and access, and cutting a slab is slow and sensitive work. Good layouts keep wet areas stacked and close to existing lines.
We install commercial plumbing and build restrooms for businesses across Nashville and Middle Tennessee. We coordinate fixture counts and locations with the plans, cut and patch slabs, run water, sewer and vent lines, set fixtures and test everything before the walls and floors are closed.
What you get
Restrooms sized for occupancy.
Clearances and grab bars built to standard.
Under-slab lines installed and restored.
Interceptors and drains where food service needs them.
The process
We confirm counts, locations and tie-ins.
Under-slab and in-wall lines are installed and tested.
Fixtures are set, trimmed and tested.
FAQ
It depends on occupancy and use, and the code sets the minimum. We confirm it during planning.
Many do. We check local requirements early.
Yes, though it can involve cutting the slab. We plan it carefully.
Service areas
From Clarksville to Shelbyville and Dickson to Cookeville, pick your city to see the build-out work we handle in your part of Middle Tennessee.
Not on the list? Call 615-431-3789. We take projects across Middle Tennessee.
Call, text or send the form. Tell us about the space, how you will use it and when you need to open, and we will take it from there.